introduction
Contract Overview
Tseung Kwan O – Lam Tin Tunnel – Main Tunnel and Associated Works mainly comprises the construction of a 2.2 km long dual two-lane main tunnel connecting Kwun Tong and Tseung Kwan O, and a branch tunnel connecting the main tunnel from Tseung Kwan O to Eastern Harbour Crossing.